A midstream oil gathering system feeding a refinery faced wax–asphaltene deposits from variable crudes and intermittent flow. After implementing Guardian’s Flowsol-based flow assurance program, pigging intervals were extended, flow disruptions avoided, and pig-trap waste reduced by 70% in the first six months.
Crude gathering lines carry oil from many sources at changing rates. When crude chemistry varies, flow starts and stops, and temperatures swing, wax and asphaltene can drop out and stick to the pipe wall. Deposits narrow the line, raise pressure, and force more frequent pigging.
Each pigging run takes time and produces solids that have to be collected and sent for disposal. As deposits build faster, the pigging window gets tighter, and the risk of a blockage goes up.
This refinery-fed gathering system ran 4 to 8 inch lines, including sections of poly pipe that are harder to treat. The operator needed longer pigging intervals without flow disruption, and less solid waste to dispose of.
A refinery-fed crude oil gathering system experienced accelerated wax–asphaltene deposition driven by variable crudes, fluctuating flow rates, start-stop conditions, and temperature swings across 4–8 inch lines and sections of harder-to-treat poly pipe.
As deposits built, pigging windows tightened. The operation needed longer pigging intervals without flow disruption or blockages, while reducing the amount of recovered solids sent for costly disposal.
The operator partnered with Guardian to characterize deposit samples and confirm wax–asphaltene composition through lab evaluation. With that input, a program was developed to disperse existing deposits and limit further agglomeration using Flowsol as the primary solvent/dispersant. Placement and dosage were set to match variable flow rates and mixed pipe materials.
Pigging intervals extended under variable flow: Pigging frequency reduced while maintaining stable operation.
Waste disposal reduced in the first six months: Recovered pig-trap solids sent for disposal dropped 70% over the first six months of Flowsol treatment.
Operating approach standardized across assets: After stabilization, the program was adopted across 12 similar gathering systems.
This data summarizes the system context and the first six months of operational outcomes following program implementation. It reflects variable-rate gathering service feeding a refinery, mixed pipe materials, and deposit behavior observed during pigging, with disposal reduction used as a practical indicator of improved solids handling and control.


Product Finder
Looking for a specific product? Enter it in the search bar here, or get in touch with our team if you have any questions.
Product Finder
Product Finder
Looking for a specific product? Enter it in the search bar here, or get in touch with our team if you have any questions.
Product Finder
Oil & Gas
Building & Facility Management
Manufacturing