Lubricant buildup on semi-autogenous (SAG) / ball mill open gear was masking tooth condition and threatening to extend a planned shutdown window at a Canadian gold mine. Using Traxol EP3, the team degreased the gear without preheating or hand-wiping delivering an inspection-ready finish in ~3 hours per gear.
A SAG or ball mill runs on a large open girth gear. Over time, spent lubricant and ore fines build up on the teeth. That buildup hides wear, pitting and misalignment, so the gear cannot be inspected properly until it is cleaned.
Cleaning usually happens inside a planned shutdown, and every hour counts. Conventional methods can mean preheating the lubricant, scraping, and hand-wiping each tooth. That adds labour, adds contact time around the gear, and can push the shutdown past its window.
At this Canadian gold mine, the maintenance team needed a clean that reached tooth faces and roots, worked at ambient temperature, and fit the existing schedule. The goal was simple: get the gear inspection-ready without extending the outage.
Lubricant buildup and embedded debris can mask gear condition, damage teeth, and lead to costly component repairs or replacement.
Traditional cleaning can be labour-intensive and consume valuable shutdown time. The site needed a fast, repeatable clean that cleared teeth faces and roots without adding preheating, hand-wiping, or extended downtime.
The site used a defined shutdown cleaning approach designed to work at ambient temperatures and fit within normal maintenance schedule. A thixotropic degreasing lubricant was applied directly to loaded gear teeth to soften and mobilize spent lubricant and trapped debris while the SAG and ball mill were operational. The procedure cleaned lubricant and removed residues which were collected for disposal without additional hand-wiping steps.
Inspection-ready gear surfaces restored: Open gear teeth faces and roots cleared to bare metal condition to support inspection and adjustment work.
Cleaning completed inside a short maintenance window: Two large ball/SAG mill gears start-to-finish (including staging, degrease, rinse, demobilize) in ~3 hours each.
Manual cleaning reduced: The process avoided preheating and eliminated hand-wiping steps that typically add labour and contact time.





Product Finder
Looking for a specific product? Enter it in the search bar here, or get in touch with our team if you have any questions.
Product Finder
Product Finder
Looking for a specific product? Enter it in the search bar here, or get in touch with our team if you have any questions.
Product Finder
Oil & Gas
Building & Facility Management
Manufacturing